Hotline:010-53051732

 Tel:        13552413290 

 
中文版   English
 
 
   

 
 
  Current Location: Home > PRODUCT > Mobile transport equipment > Lifting Gear
Lifting Gear
Lifting Gear

 

  

lifting block in the dock

translation block in the dock

translation block on the ground

lifting capacity:3000tons.

Lifting Gear+3D Localizer + Translation Device

Introduction

After section construction finished, the device is carried into the ship, and it should be used with the panning device and the other combined device

After the section construction, the lifting and dropping wheels should be first added, which consists of hole-pined planes.

Approach to install wheels:

Panning device is used to install wheels for special use, and the top part is divided by 3D positioning tractors when it lifted to the section. The ends of the shelf is located in the bottom of section, and the 3D tractor is used to connect the target size of sections within the certain measures. The 3D tractor is moved out panning to connect with the lift & drop device, before the lift & drop device started.

  
 

 

Related Links  
Previous Article: First Page
Next Article: 3D Localizer
 
News
Surface tension and pre-treatment – effects of piezo plasma
Surface tension and pre-treatment – effects of piezo plasma
Surface tension and pre-treatment – effects of piezo plasma,the surface energies of th
[Read More] >>
plasma system changes the surface energy of substrates
plasma system changes the surface energy of substrates
The plasma system is reliable and works as a substrate treating and cleaning device j
[Read More] >>
piezo Plasma technology in 3D printing
piezo Plasma technology in 3D printing
Piezo Plasma technology in 3D printing,Bonding individual parts with significantly improv
[Read More] >>
Links:
Beijing Times Technology Co., Ltd. in the sea @ All Rights Reserved Copyright © 2007-2016 , All Rights Reserve Beijing ICP 16028120 http://bjcsts.com/
  • 010-53051732
    13552413290
    (工作日9:00 - 18:00)